Preview version (prototype) — content and images are being finalised
Engineering · Supply · Execution
Home/Articles/Cleanroom maintenance

Cleanroom maintenance

A documented maintenance programme is essential for the correct, reliable and integrated operation of a cleanroom, covering everything from ventilation and plant rooms to electrical and control systems, architectural elements and sandwich-panel joints.

Why maintenance matters

A cleanroom is an integrated system; a fault in one part can stop the whole system and shut down production lines, causing heavy costs, lost time, bottlenecks and sometimes product damage. A planned, preventive maintenance programme avoids these stoppages.

Areas that need maintenance

1. Mechanical

  • Hygienic and non-hygienic air handling units and exhaust fans
  • Heating and cooling supply
  • Air ducts, dampers, insulation and fittings
  • Filtration: HEPA, bag, pre- and primary filters
  • Air terminals, pass boxes and pass-throughs

2. Electrical & control

  • Pressure, humidity, temperature displays and particle monitoring
  • Fan speed controls, solenoid valves and sensors
  • Access control and door interlocks
  • Electrical and control panels
  • Cleanroom lighting

3. Architectural

  • Walls, ceilings and all joints, fittings and profiles
  • Doors and windows
  • Flooring

Fartak Pharmed maintenance services

Our after-sales team designs and runs complete maintenance programmes so air quality, air changes and room pressure differentials stay at optimum levels and production lines run without interruption.

After-sales service

Planning a cleanroom or pharmaceutical project?

Talk to our engineers for consultation, technical specifications and quotations.

Request a consultationRequest a quote