A documented maintenance programme is essential for the correct, reliable and integrated operation of a cleanroom, covering everything from ventilation and plant rooms to electrical and control systems, architectural elements and sandwich-panel joints.
Why maintenance matters
A cleanroom is an integrated system; a fault in one part can stop the whole system and shut down production lines, causing heavy costs, lost time, bottlenecks and sometimes product damage. A planned, preventive maintenance programme avoids these stoppages.
Areas that need maintenance
1. Mechanical
- Hygienic and non-hygienic air handling units and exhaust fans
- Heating and cooling supply
- Air ducts, dampers, insulation and fittings
- Filtration: HEPA, bag, pre- and primary filters
- Air terminals, pass boxes and pass-throughs
2. Electrical & control
- Pressure, humidity, temperature displays and particle monitoring
- Fan speed controls, solenoid valves and sensors
- Access control and door interlocks
- Electrical and control panels
- Cleanroom lighting
3. Architectural
- Walls, ceilings and all joints, fittings and profiles
- Doors and windows
- Flooring
Fartak Pharmed maintenance services
Our after-sales team designs and runs complete maintenance programmes so air quality, air changes and room pressure differentials stay at optimum levels and production lines run without interruption.
Planning a cleanroom or pharmaceutical project?